Your existing heating arrangement
- Oil / gas supply
- Existing burner
- Existing boiler or heater
- Chimney
The oil or gas burner supplies heat to the boiler or heater. The existing gas path and pollution-control equipment are reviewed during assessment.
These details are drawn from Dhruv Bio Energy's supplied company documents. Confirm the latest specification and project fit with our team.
We review your equipment, fuel and operating conditions to discuss a suitable configuration.
Explore related servicesA simple system overview showing fuel delivery, heat generation and the flue-gas route.
The oil or gas burner supplies heat to the boiler or heater. The existing gas path and pollution-control equipment are reviewed during assessment.
A suitable feeder supplies the external combustor. The boiler or heater is retained where suitable, with the heat connection, draught and particulate-control system engineered around it.
A clear route from reviewing your existing equipment to preparing your operators.
We review your boiler condition, fuel consumption and plant requirements.
We plan a suitable combustor, feeding system and equipment layout.
Equipment is fitted and connected according to the agreed project scope.
The system is started, settings are adjusted and performance checks are carried out.
Operators receive guidance on operation, routine checks and maintenance.
The final process, schedule and scope are confirmed for each project.
Typical elements considered during engineering. The quotation defines which items are included, their ratings and the site interfaces.
An external combustion arrangement is assessed against the existing boiler or thermic fluid heater and required heat input.
Fuel delivery is matched to compatible pellets or Cashew DOC and the plant operating pattern.
The combustion-to-equipment interface is engineered around available space, heat transfer and existing equipment condition.
Air supply, feed control and protective interfaces are reviewed together with the existing heating equipment.
Ducting, draught and collection requirements are checked for the proposed biomass fuel.
Access for ash removal, cleaning, maintenance and safe material movement is included in layout planning.
A system overview to help you discuss the right arrangement with our team.
Review equipment condition, current fuel, operating load and available space.
Select the proposed biomass and assess the combustor, feeding and heat interface.
Define controls, site work, required permissions and an agreed installation window.
Review operation against the agreed scope and compare costs at equivalent useful output.
Use these details to move from a general product enquiry to a site-specific recommendation.
Boiler or heater nameplate, capacity, working conditions, photos and general arrangement drawing.
Fuel consumption and delivered price, operating hours and useful steam or heat output.
Space for combustor and storage, biomass deliveries, ash handling, utilities and shutdown availability.
Enter your plant details. Results update automatically.
Enter your plant details to calculate. Figures below start at zero.
No estimate calculated yet.
Calculate to include your figures, or contact us now.
Indicative only, not a quotation or guaranteed saving. Comparison includes fuel and entered additional costs. Financing, taxes, downtime and unentered costs are excluded. Monthly figure = annual difference ÷ 12.
Fossil CO₂ displaced estimates the original fuel's direct combustion CO₂ at full biomass substitution. Biomass stack CO₂, CH₄, N₂O and supply-chain emissions are not included; this is not net carbon reduction or a carbon-credit calculation.
Annual useful heat = capacity × load fraction × hours/day × days/year. Boiler TPH is converted using the entered heat per tonne of steam; heater capacity is converted from lakh kcal/hour. Each fuel requirement = useful heat ÷ (its NCV × its efficiency fraction).
Annual saving = current fuel cost − biomass fuel cost − (biomass kg × extra cost/kg). Payback in months = investment in rupees ÷ positive average monthly saving. Bar lengths share the same scale, so higher biomass costs remain visible.
CO₂ = current fuel input energy (GJ) × selected emission factor ÷ 1,000, in tonnes/year. Conversion: 1 kcal = 4.1868 kJ. Default factors: diesel/LDO 74.1, furnace oil 77.4, PNG 56.1 kg CO₂/GJ on an NCV basis, from IPCC 2006 Guidelines, Volume 2, Chapter 2. LDO uses the gas/diesel oil category. NCV presets are examples, not lab specifications or IPCC calorific-value defaults.
Open a question below. For advice on your plant, share your requirements with our team.
We check equipment condition, capacity, heating arrangement and site space before recommending a kit.
The company offering describes a retrofit arrangement without pressure-part modification. We still confirm the actual design, work scope and any required approvals for your equipment.
The schedule depends on fabrication, civil and electrical work, site readiness and the shutdown window. It is agreed after the assessment.
We compare costs for the same useful steam or heat output. The estimate considers fuel, electricity, manpower, maintenance and ash handling, with the assumptions shown.