● Industrial biomass solutions  ·  Serving plants across India
Home  /  Products  /  Oil / gas to biomass retrofit kit
Convert existing heating equipment

Oil / gas to biomass retrofit kit

A retrofit solution for selected oil- or gas-fired boilers and thermic fluid heaters, assessed against equipment condition, process requirements and biomass fuel availability.

Enquire about this product
Oil and gas boiler converted to biomass
Specifications

Product details for your technical review.

These details are drawn from Dhruv Bio Energy's supplied company documents. Confirm the latest specification and project fit with our team.

Boilers listed750 kg/h up to 15 TPH
Thermic fluid heaters listed100,000 to 6,000,000 kcal/h
Fuel optionsPellets and Cashew DOC
Product features

Designed around your process.

We review your equipment, fuel and operating conditions to discuss a suitable configuration.

Explore related services
  • Existing equipment is reviewed before conversion
  • Supplied profile states no pressure-part modification for the listed retrofit scope
  • Automated fuel feeding can be part of the system
  • Project scope, approvals and emissions are confirmed for each site
The supplied offering includes a rapid retrofit description and a fuel-cost saving claim. These are not presented as guaranteed results here: shutdown duration and savings depend on equipment condition, fuel prices, operating hours, load and project scope. A site-specific estimate and applicable approval requirements must be confirmed before execution.
Before & after retrofit

See what changes when you switch to biomass.

A simple system overview showing fuel delivery, heat generation and the flue-gas route.

BEFORE / OIL & GAS

Your existing heating arrangement

Existing oil or gas systemOil or gas supply feeds a burner, which heats the existing boiler or heater; flue gas travels to the chimney.Oil / gassupplyExistingburnerExisting boileror heaterChimney
  1. Oil / gas supply
  2. Existing burner
  3. Existing boiler or heater
  4. Chimney

The oil or gas burner supplies heat to the boiler or heater. The existing gas path and pollution-control equipment are reviewed during assessment.

AFTER / BIOMASS

A biomass combustion arrangement

Conceptual biomass retrofit systemBiomass passes from hopper to feeder and external combustor, which heats the existing equipment. The illustrated gas route then passes through a cyclone, bag filter or ESP, and ID fan to a chimney. Actual configuration follows engineering review.BiomasshopperAutomaticfeederExternalcombustorExisting boileror heaterCycloneBag filteror ESPID fanChimneyFuel feeding → combustion → heat → flue-gas treatment
  1. Biomass hopper
  2. Automatic feeder
  3. External combustor
  4. Existing boiler or heater
  5. Cyclone
  6. Bag filter or ESP
  7. ID fan
  8. Chimney

A suitable feeder supplies the external combustor. The boiler or heater is retained where suitable, with the heat connection, draught and particulate-control system engineered around it.

Illustrative arrangement. Equipment suitability, fuel compatibility, pressure-part scope and applicable approvals are checked before a proposal. Collection equipment, fan position and connections may differ by site; this is not an installation drawing.
Discuss your existing boiler
From assessment to operation

Your retrofit project, step by step.

A clear route from reviewing your existing equipment to preparing your operators.

  1. Assessment

    We review your boiler condition, fuel consumption and plant requirements.

  2. Design

    We plan a suitable combustor, feeding system and equipment layout.

  3. Installation

    Equipment is fitted and connected according to the agreed project scope.

  4. Trial

    The system is started, settings are adjusted and performance checks are carried out.

  5. Training

    Operators receive guidance on operation, routine checks and maintenance.

The final process, schedule and scope are confirmed for each project.

System configuration

Understand what each part does.

Typical elements considered during engineering. The quotation defines which items are included, their ratings and the site interfaces.

01

Biomass combustor

An external combustion arrangement is assessed against the existing boiler or thermic fluid heater and required heat input.

02

Fuel hopper & feeder

Fuel delivery is matched to compatible pellets or Cashew DOC and the plant operating pattern.

03

Heat connection

The combustion-to-equipment interface is engineered around available space, heat transfer and existing equipment condition.

04

Air & control arrangement

Air supply, feed control and protective interfaces are reviewed together with the existing heating equipment.

05

Flue gas & particulate control

Ducting, draught and collection requirements are checked for the proposed biomass fuel.

06

Ash & service access

Access for ash removal, cleaning, maintenance and safe material movement is included in layout planning.

How it works

From fuel to useful process heat.

A system overview to help you discuss the right arrangement with our team.

  1. 01

    Assess the existing unit

    Review equipment condition, current fuel, operating load and available space.

  2. 02

    Match combustion & fuel

    Select the proposed biomass and assess the combustor, feeding and heat interface.

  3. 03

    Plan the integration

    Define controls, site work, required permissions and an agreed installation window.

  4. 04

    Commission & compare

    Review operation against the agreed scope and compare costs at equivalent useful output.

Before equipment selection

Three inputs for a better technical proposal.

Use these details to move from a general product enquiry to a site-specific recommendation.

01

Existing equipment

Boiler or heater nameplate, capacity, working conditions, photos and general arrangement drawing.

02

Current operating baseline

Fuel consumption and delivered price, operating hours and useful steam or heat output.

03

Site readiness

Space for combustor and storage, biomass deliveries, ash handling, utilities and shutdown availability.

Explore a biomass retrofit

Estimate your annual fuel savings.

Enter your plant details. Results update automatically.

Review calculation assumptions

Extra running cost covers additional handling, ash disposal and similar costs per kg of biomass. Blank investment leaves payback uncalculated. All preset values are illustrative; replace them with your plant data.

Use net calorific values (NCV), not GCV, and efficiencies on the same basis. Fuel selection fills example NCV and an IPCC CO₂ factor; both can be edited. Changing fuel clears its price. Steam heat depends on pressure and feedwater conditions; 630,000 kcal/tonne is only an example. For a heater, enter useful rated output in lakh kcal/hour; the steam heat field is not used.

Your annual savings overview

Enter your plant details to calculate. Figures below start at zero.

Estimated annual fuel savings₹0Enter your values to see the comparison
Current fuel cost / year₹0
With Dhruv biomass retrofit / year₹0
Fossil CO₂ displaced0 t/year
Biomass required0 t/year
Simple paybackAdd investment
View cost breakdown
Average monthly cost difference
₹0
Biomass fuel cost / year
₹0
Additional running cost / year
₹0
Estimated current fuel use / year
0 /year

No estimate calculated yet.

Request a proposal with these numbers

Calculate to include your figures, or contact us now.

Estimate assumptions & exclusions

Indicative only, not a quotation or guaranteed saving. Comparison includes fuel and entered additional costs. Financing, taxes, downtime and unentered costs are excluded. Monthly figure = annual difference ÷ 12.

Fossil CO₂ displaced estimates the original fuel's direct combustion CO₂ at full biomass substitution. Biomass stack CO₂, CH₄, N₂O and supply-chain emissions are not included; this is not net carbon reduction or a carbon-credit calculation.

Calculation method and sources

Annual useful heat = capacity × load fraction × hours/day × days/year. Boiler TPH is converted using the entered heat per tonne of steam; heater capacity is converted from lakh kcal/hour. Each fuel requirement = useful heat ÷ (its NCV × its efficiency fraction).

Annual saving = current fuel cost − biomass fuel cost − (biomass kg × extra cost/kg). Payback in months = investment in rupees ÷ positive average monthly saving. Bar lengths share the same scale, so higher biomass costs remain visible.

CO₂ = current fuel input energy (GJ) × selected emission factor ÷ 1,000, in tonnes/year. Conversion: 1 kcal = 4.1868 kJ. Default factors: diesel/LDO 74.1, furnace oil 77.4, PNG 56.1 kg CO₂/GJ on an NCV basis, from IPCC 2006 Guidelines, Volume 2, Chapter 2. LDO uses the gas/diesel oil category. NCV presets are examples, not lab specifications or IPCC calorific-value defaults.

Frequently asked questions

Common questions, clear answers.

Open a question below. For advice on your plant, share your requirements with our team.

Will the kit suit my existing boiler or heater?

We check equipment condition, capacity, heating arrangement and site space before recommending a kit.

Will pressure parts need to change?

The company offering describes a retrofit arrangement without pressure-part modification. We still confirm the actual design, work scope and any required approvals for your equipment.

How long does installation take?

The schedule depends on fabrication, civil and electrical work, site readiness and the shutdown window. It is agreed after the assessment.

How do you estimate savings?

We compare costs for the same useful steam or heat output. The estimate considers fuel, electricity, manpower, maintenance and ash handling, with the assumptions shown.