Oil / gas to biomass conversion

Boiler Retrofitting

Retrofit options for selected oil- or gas-fired boilers and thermic-fluid heaters, assessed against equipment condition, process needs, fuel compatibility and site constraints.

Discuss this service ↗
Engineers inspecting and servicing an industrial boiler system
Service overview

Built around your plant requirements.

Dhruv Bio Energy’s offering lists an oil / gas-to-biomass retrofit kit for boilers and thermic-fluid heaters. Retrofit feasibility depends on the existing unit, heat load, fuel properties, burner / furnace configuration, feeding space, emissions requirements and statutory scope. A site-specific design and shutdown plan are required before confirming installation time or performance.

Boilers listed750 kg/h to 15 TPH
Thermic-fluid heaters listed100,000 to 6,000,000 kcal/h
Retrofit fuels listedPellets and Cashew DOC
Assessment scope

Potential retrofit scope

Final equipment and service boundaries are documented in the technical proposal.

  • Inspect boiler / heater, furnace and current fuel system
  • Select a compatible biomass fuel and feeding arrangement
  • Plan combustion equipment, controls and fuel handling within agreed boundaries
  • Commission and tune the system against agreed operating conditions
All solutions ↗
PROJECT-SPECIFIC BASIS

Savings and approvals are project-specific

The supplied offering contains fuel-saving and emissions figures, but these are not presented here as universal outcomes. A comparison requires current fuel prices, biomass quality, operating hours, steam / heat load and auxiliary costs. The retrofit proposal must state pressure-part boundaries, applicable approvals and responsibility for each item; regulatory requirements are verified for the actual equipment and jurisdiction.

How to get started

A clear technical review before a proposal.

Share plant details

Boiler or heater capacity, current fuel, steam or heat demand, operating hours and location.

Review the system

We discuss equipment condition, fuel handling, process requirements and site constraints.

Agree the scope

Technical limits, responsibilities, performance basis, schedule and commercial terms are documented.

Implement & support

Work and follow-up are carried out against the approved project scope and contract.

Questions & answers

Before you plan the project.

Can every oil- or gas-fired boiler be converted?

No blanket compatibility is assumed. The boiler and heater must be inspected and engineered for the proposed biomass fuel and operating requirements.

Is a specific fuel-saving percentage guaranteed?

No. Fuel-cost change depends on actual fuel prices, quality, efficiency, operating load and site conditions. Any estimate should be supported by a project calculation and written commercial basis.

How long does installation take?

The schedule depends on equipment, scope, access, fabrication and shutdown window. It is confirmed after technical review.

Start with a technical discussion

Share your boiler and process details.

Tell us the plant location, current fuel, capacity and requirement. Our team can outline the next assessment steps.

Send an enquiry ↗
✆