● Industrial biomass solutions  ·  Serving plants across India
Home  /  Solutions  /  Boiler Retrofitting
Oil / gas to biomass conversion

Boiler Retrofitting

Retrofit options for selected oil- or gas-fired boilers and thermic-fluid heaters, assessed against equipment condition, process needs, fuel compatibility and site constraints.

Discuss this service
Engineers inspecting and servicing an industrial boiler system
Service overview

Built around your plant requirements.

Dhruv Bio Energy’s offering lists an oil / gas-to-biomass retrofit kit for boilers and thermic-fluid heaters. Retrofit feasibility depends on the existing unit, heat load, fuel properties, burner / furnace configuration, feeding space, emissions requirements and statutory scope. A site-specific design and shutdown plan are required before confirming installation time or performance.

Boilers listed750 kg/h to 15 TPH
Thermic-fluid heaters listed100,000 to 6,000,000 kcal/h
Retrofit fuels listedPellets and Cashew DOC
Assessment scope

Potential retrofit scope

Final equipment and service boundaries are documented in the technical proposal.

  • Inspect boiler / heater, furnace and current fuel system
  • Select a compatible biomass fuel and feeding arrangement
  • Plan combustion equipment, controls and fuel handling within agreed boundaries
  • Commission and tune the system against agreed operating conditions
All solutions
PROJECT-SPECIFIC BASIS

Savings and approvals are project-specific

The supplied offering contains fuel-saving and emissions figures, but these are not presented here as universal outcomes. A comparison requires current fuel prices, biomass quality, operating hours, steam / heat load and auxiliary costs. The retrofit proposal must state pressure-part boundaries, applicable approvals and responsibility for each item; regulatory requirements are verified for the actual equipment and jurisdiction.

Estimate your fuel savings ↓
Before & after retrofit

See what changes when you switch to biomass.

A simple system overview showing fuel delivery, heat generation and the flue-gas route.

BEFORE / OIL & GAS

Your existing heating arrangement

Existing oil or gas systemOil or gas supply feeds a burner, which heats the existing boiler or heater; flue gas travels to the chimney.Oil / gassupplyExistingburnerExisting boileror heaterChimney
  1. Oil / gas supply
  2. Existing burner
  3. Existing boiler or heater
  4. Chimney

The oil or gas burner supplies heat to the boiler or heater. The existing gas path and pollution-control equipment are reviewed during assessment.

AFTER / BIOMASS

A biomass combustion arrangement

Conceptual biomass retrofit systemBiomass passes from hopper to feeder and external combustor, which heats the existing equipment. The illustrated gas route then passes through a cyclone, bag filter or ESP, and ID fan to a chimney. Actual configuration follows engineering review.BiomasshopperAutomaticfeederExternalcombustorExisting boileror heaterCycloneBag filteror ESPID fanChimneyFuel feeding → combustion → heat → flue-gas treatment
  1. Biomass hopper
  2. Automatic feeder
  3. External combustor
  4. Existing boiler or heater
  5. Cyclone
  6. Bag filter or ESP
  7. ID fan
  8. Chimney

A suitable feeder supplies the external combustor. The boiler or heater is retained where suitable, with the heat connection, draught and particulate-control system engineered around it.

Illustrative arrangement. Equipment suitability, fuel compatibility, pressure-part scope and applicable approvals are checked before a proposal. Collection equipment, fan position and connections may differ by site; this is not an installation drawing.
Discuss your existing boiler
From assessment to operation

Your retrofit project, step by step.

A clear route from reviewing your existing equipment to preparing your operators.

  1. Assessment

    We review your boiler condition, fuel consumption and plant requirements.

  2. Design

    We plan a suitable combustor, feeding system and equipment layout.

  3. Installation

    Equipment is fitted and connected according to the agreed project scope.

  4. Trial

    The system is started, settings are adjusted and performance checks are carried out.

  5. Training

    Operators receive guidance on operation, routine checks and maintenance.

The final process, schedule and scope are confirmed for each project.

How to get started

A clear technical review before a proposal.

Share plant details

Boiler or heater capacity, current fuel, steam or heat demand, operating hours and location.

Review the system

We discuss equipment condition, fuel handling, process requirements and site constraints.

Agree the scope

Technical limits, responsibilities, performance basis, schedule and commercial terms are documented.

Implement & support

Work and follow-up are carried out against the approved project scope and contract.

Explore a biomass retrofit

Estimate your annual fuel savings.

Enter your plant details. Results update automatically.

Review calculation assumptions

Extra running cost covers additional handling, ash disposal and similar costs per kg of biomass. Blank investment leaves payback uncalculated. All preset values are illustrative; replace them with your plant data.

Use net calorific values (NCV), not GCV, and efficiencies on the same basis. Fuel selection fills example NCV and an IPCC CO₂ factor; both can be edited. Changing fuel clears its price. Steam heat depends on pressure and feedwater conditions; 630,000 kcal/tonne is only an example. For a heater, enter useful rated output in lakh kcal/hour; the steam heat field is not used.

Your annual savings overview

Enter your plant details to calculate. Figures below start at zero.

Estimated annual fuel savings₹0Enter your values to see the comparison
Current fuel cost / year₹0
With Dhruv biomass retrofit / year₹0
Fossil CO₂ displaced0 t/year
Biomass required0 t/year
Simple paybackAdd investment
View cost breakdown
Average monthly cost difference
₹0
Biomass fuel cost / year
₹0
Additional running cost / year
₹0
Estimated current fuel use / year
0 /year

No estimate calculated yet.

Request a proposal with these numbers

Calculate to include your figures, or contact us now.

Estimate assumptions & exclusions

Indicative only, not a quotation or guaranteed saving. Comparison includes fuel and entered additional costs. Financing, taxes, downtime and unentered costs are excluded. Monthly figure = annual difference ÷ 12.

Fossil CO₂ displaced estimates the original fuel's direct combustion CO₂ at full biomass substitution. Biomass stack CO₂, CH₄, N₂O and supply-chain emissions are not included; this is not net carbon reduction or a carbon-credit calculation.

Calculation method and sources

Annual useful heat = capacity × load fraction × hours/day × days/year. Boiler TPH is converted using the entered heat per tonne of steam; heater capacity is converted from lakh kcal/hour. Each fuel requirement = useful heat ÷ (its NCV × its efficiency fraction).

Annual saving = current fuel cost − biomass fuel cost − (biomass kg × extra cost/kg). Payback in months = investment in rupees ÷ positive average monthly saving. Bar lengths share the same scale, so higher biomass costs remain visible.

CO₂ = current fuel input energy (GJ) × selected emission factor ÷ 1,000, in tonnes/year. Conversion: 1 kcal = 4.1868 kJ. Default factors: diesel/LDO 74.1, furnace oil 77.4, PNG 56.1 kg CO₂/GJ on an NCV basis, from IPCC 2006 Guidelines, Volume 2, Chapter 2. LDO uses the gas/diesel oil category. NCV presets are examples, not lab specifications or IPCC calorific-value defaults.

Frequently asked questions

Common questions, clear answers.

Open a question below. For advice on your plant, share your requirements with our team.

Can my oil- or gas-fired boiler run on biomass?

We first check its condition, capacity, heating arrangement and available space. This review confirms whether a retrofit is suitable and what changes are needed.

Do I need to replace the whole boiler?

A retrofit aims to use suitable existing equipment with a biomass combustion and feeding arrangement. The technical review confirms which parts can stay and which need to change.

How much can I save?

Savings depend on your current fuel price, biomass price, consumption and operating hours. Share these details so we can prepare an estimate for the same steam or heat output.

How long will my plant need to stop?

The installation plan and shutdown window are agreed after reviewing the equipment, scope and site readiness. Share your production schedule during the assessment.