Under the Steam at Cost model described in Dhruv Bio Energy’s company profile, the project can be structured so the customer does not make the boiler-system capital investment. Dhruv Bio Energy’s offering describes a combined scope for boiler retrofitting, biomass fuel supply and maintenance, with billing based on steam generated. Exact scope and commercial allocation are finalized in the contract.
Final equipment and service boundaries are documented in the technical proposal.
Steam quality and quantity, meter location and calibration, minimum or take-or-pay volumes (if any), fuel logistics, utilities, site access, shutdowns, taxes, escalation, operating responsibilities and service levels must be set out in the project agreement. “Zero capex” and steam-billing terms apply only as written in the final contract.
A clear billing model built around measured supply and an agreed rate.
Steam is billed per tonne, and heat per agreed unit, using the measurement method defined in your supply agreement.
Tariff inclusions depend on the agreed project scope.
Boiler or heater capacity, current fuel, steam or heat demand, operating hours and location.
We discuss equipment condition, fuel handling, process requirements and site constraints.
Technical limits, responsibilities, performance basis, schedule and commercial terms are documented.
Work and follow-up are carried out against the approved project scope and contract.
Open a question below. For advice on your plant, share your requirements with our team.
You buy steam under an agreed supply arrangement instead of managing every part of steam generation yourself. The proposal defines the fuel supply, operations, equipment and other responsibilities.
Fuel supply and boiler operations can be included in Dhruv’s scope. The proposal clearly states who pays for fuel, supplies manpower and handles maintenance and ash.
Billing follows the agreed steam quantity and tariff. The contract specifies the meter, measurement basis, rate adjustments and any minimum-volume terms.
Share boiler capacity, steam pressure, daily demand, operating hours, current fuel use and plant location. A boiler-house layout and recent operating data help with the review.