Steam supply contract

Steam at Cost

A project-specific steam-supply arrangement that can combine boiler retrofit, biomass fuel supply and boiler operations. Dhruv Bio Energy’s profile describes a zero-capex mode and billing for steam generated, subject to the signed contract.

Discuss this service
Industrial steam boiler and connected process piping
Service overview

Built around your plant requirements.

Under the Steam at Cost model described in Dhruv Bio Energy’s company profile, the project can be structured so the customer does not make the boiler-system capital investment. Dhruv Bio Energy’s offering describes a combined scope for boiler retrofitting, biomass fuel supply and maintenance, with billing based on steam generated. Exact scope and commercial allocation are finalized in the contract.

Investment modelZero-capex mode listed in company profile
Billing basisSteam generated, as defined in contract
Potential scopeRetrofit, biomass fuel supply and maintenance
Assessment scope

How the arrangement is structured

Final equipment and service boundaries are documented in the technical proposal.

  • Review steam demand, pressure / temperature requirements and operating hours
  • Assess the current boiler house, utilities, fuel storage and access
  • Define the equipment, fuel-supply and operations responsibilities
  • Agree the metering point, billing basis, service levels and contract duration
All solutions
PROJECT-SPECIFIC BASIS

Terms to confirm in writing

Steam quality and quantity, meter location and calibration, minimum or take-or-pay volumes (if any), fuel logistics, utilities, site access, shutdowns, taxes, escalation, operating responsibilities and service levels must be set out in the project agreement. “Zero capex” and steam-billing terms apply only as written in the final contract.

Steam & heat supply

Pay for the Steam or Heat You Use

A clear billing model built around measured supply and an agreed rate.

Your steam / heat bill

Measured at your plant. Billed at the agreed rate.

Steam is billed per tonne, and heat per agreed unit, using the measurement method defined in your supply agreement.

Measured ConsumptionAgreed RateYour Bill

Tariff Components

  • Equipment
  • Biomass Fuel
  • Operators
  • Ash Handling
  • Compliance Support
  • Maintenance
  • Standby

Tariff inclusions depend on the agreed project scope.

How to get started

A clear technical review before a proposal.

Share plant details

Boiler or heater capacity, current fuel, steam or heat demand, operating hours and location.

Review the system

We discuss equipment condition, fuel handling, process requirements and site constraints.

Agree the scope

Technical limits, responsibilities, performance basis, schedule and commercial terms are documented.

Implement & support

Work and follow-up are carried out against the approved project scope and contract.

Frequently asked questions

Common questions, clear answers.

Open a question below. For advice on your plant, share your requirements with our team.

What does Steam at Cost mean?

You buy steam under an agreed supply arrangement instead of managing every part of steam generation yourself. The proposal defines the fuel supply, operations, equipment and other responsibilities.

Who supplies the fuel and runs the boiler?

Fuel supply and boiler operations can be included in Dhruv’s scope. The proposal clearly states who pays for fuel, supplies manpower and handles maintenance and ash.

How is the steam bill calculated?

Billing follows the agreed steam quantity and tariff. The contract specifies the meter, measurement basis, rate adjustments and any minimum-volume terms.

What do you need to prepare a proposal?

Share boiler capacity, steam pressure, daily demand, operating hours, current fuel use and plant location. A boiler-house layout and recent operating data help with the review.